Trawsfynydd, North Wales
MAgnox Reactors Height Reduction Enabling Works
OBR Construction are subcontracting under Erith on the next large project within the decommissioning phase of the Trawsfynydd Nuclear Site.
The project involved civil engineering work within the two main reactor buildings to prepare the site for its 70 year care and maintenance plan, which aims to have the site fully decommissioned by 2083
​
OBR work items include
Demolition of internal walls
Cladding and supporting steel work
Removal and install of new security doors throughout
Coring new ventilation pathways
Install of new staircases
Setup temporary electrical supply to support the project
Working within radiation controlled areas
Working within asbestos controlled areas
Specialist coating to waterproof structure
Concrete repair to RC structures
We have also undertaken additional projects within the site as main contractor to assist the decommissioning such as:
Installing ducting around the perimeter of the site
Demolition of buildings
Waterproofing of structures
De-watering of reactor basement
Installing of handrails